{
  "slug": "radio-astronomy-costed-wireless-power-nobody-costed-the-beam",
  "title": "Radio astronomy has costed wireless power at five kilometres for thirty watts. Nobody has costed the beam.",
  "date": "2026-10-10",
  "summary": "CRAF's Summer 2026 newsletter puts a separation distance on wireless power transfer for the first time. The method it used is scoped by its own title to inductive systems below 30 MHz, and the protection criteria it applies say in plain text that they are for terrestrial sources. For a space-to-Earth beam there is no published number, and the gap is roughly 181 dB.",
  "author": "Ido Yahalomi",
  "tags": [
    "standards",
    "regulation",
    "spectrum",
    "radio-astronomy",
    "sbsp"
  ],
  "provenance": "documented",
  "words": 1869,
  "headings": [
    {
      "id": "what-craf-actually-published",
      "level": 2,
      "text": "What CRAF actually published"
    },
    {
      "id": "the-method-stops-at-thirty-megahertz-and-it-says-so-in-its-t",
      "level": 2,
      "text": "The method stops at thirty megahertz, and it says so in its title"
    },
    {
      "id": "the-missing-number-is-about-181-db-and-that-is-an-estimate",
      "level": 2,
      "text": "The missing number is about 181 dB, and that is an estimate"
    },
    {
      "id": "the-regulator-has-already-set-a-limit-above-what-its-own-stu",
      "level": 2,
      "text": "The regulator has already set a limit above what its own studies asked for"
    },
    {
      "id": "what-this-changes-for-a-ground-site",
      "level": 2,
      "text": "What this changes for a ground site"
    },
    {
      "id": "what-would-change-my-mind",
      "level": 2,
      "text": "What would change my mind"
    },
    {
      "id": "sources",
      "level": 2,
      "text": "Sources"
    }
  ],
  "html": "<p>Radio astronomy has published a cost for wireless power transfer. It is a separation</p>\n<p>distance of about five kilometres, and it was computed for inductive chargers delivering</p>\n<p>more than thirty watts below 30 MHz. For a space-to-Earth beam there is no number at all,</p>\n<p>and this article works out roughly how large the missing one is.</p>\n<p>The source is the Summer 2026 issue of <em>CRAF News</em>, the newsletter of the European Science</p>\n<p>Foundation&apos;s Expert Committee on Radio Astronomy Frequencies, published in September 2026.</p>\n<p>Its article &quot;Wireless Power Transfer and Radio Astronomy: an emerging compatibility</p>\n<p>challenge&quot;, by Fabio Giovanardi of the Arcetri Astrophysical Observatory at INAF in</p>\n<p>Florence, is the first place this project has seen the radio astronomy community put a</p>\n<p>quantified compatibility assessment of wireless power next to a statement about space-based</p>\n<p>solar power.</p>\n<p>It is worth being exact about what that is and is not. CRAF is a scientific expert committee.</p>\n<p>It does not set the ITU agenda, it does not write the Radio Regulations, and a newsletter</p>\n<p>article is not a work item. Nothing in it changes a pinned edition. What it does do is put a</p>\n<p>method and a distance on the record, and the interesting part is where that method stops.</p>\n<h2 id=\"what-craf-actually-published\">What CRAF actually published</h2>\n<p>The assessment behind the article is the Addendum to ECC Report 333, which the newsletter</p>\n<p>describes as covering higher-power, non-beam inductive wireless power systems operating in</p>\n<p>specific bands below 30 MHz and delivering more than 30 W. The bands at risk are given as</p>\n<p>the radio astronomy allocations at 13.36 to 13.41 MHz and 25.55 to 25.67 MHz, and the</p>\n<p>primary case study is LOFAR, which ASTRON&apos;s own telescope page puts at more than 70,000</p>\n<p>antennae across Europe, with 38 stations in the Netherlands, six in Germany, three in</p>\n<p>Poland, and one each in France, Ireland, Latvia, Sweden and the United Kingdom.</p>\n<p>The compatibility analysis takes a single-interferer, ground-wave approach under</p>\n<p>Recommendation ITU-R SM.2028, applies the protection criteria of Recommendation ITU-R</p>\n<p>RA.769, and draws emission assumptions from ETSI EN 303 417, CISPR 11 and CISPR 14. The</p>\n<p>result, in the newsletter&apos;s own words, is that &quot;a separation distance of around 5 km from</p>\n<p>the radio observatory would be necessary&quot;. Because the devices are portable, the article</p>\n<p>says enforcing such a zone is a regulatory problem rather than a planning one.</p>\n<p>The newsletter also sets out why the terrestrial problem is getting worse rather than</p>\n<p>better. Electric vehicle charging, covered by ECC Report 289 and its own addendum, is put at</p>\n<p>transferred power of up to 11 kW for light duty and up to 500 kW for heavy duty. CRAF&apos;s</p>\n<p>point about these is not the single-unit figure but the aggregate: a distributed fleet of</p>\n<p>chargers raises the noise floor in a way that is harder to mitigate than one high-power</p>\n<p>transmitter, and low-frequency signals propagate well. Against that, the one consolation is</p>\n<p>that vehicle chargers are fixed installations, so a separation distance is at least</p>\n<p>enforceable. The portable devices in the 30 W class are the ones nobody can put a fence</p>\n<p>around.</p>\n<p>Then there is half a page on space-based solar power. CRAF&apos;s position is that the</p>\n<p>interference problem does not stop at ground level, and that, quoting the Summer 2026</p>\n<p>newsletter, &quot;SBSP transmissions would be visible over continental scales and could affect</p>\n<p>multiple radio astronomy observatories simultaneously&quot;. There is no distance, no power</p>\n<p>density and no band in that paragraph. It is a flag, not a study, and the article says so by</p>\n<p>calling for the question to be taken up within ITU frameworks rather than reporting an</p>\n<p>answer.</p>\n<h2 id=\"the-method-stops-at-thirty-megahertz-and-it-says-so-in-its-t\">The method stops at thirty megahertz, and it says so in its title</h2>\n<p>This is the part that matters for anyone planning a receiving site. The five kilometres</p>\n<p>cannot be carried across.</p>\n<p>Recommendation ITU-R SM.2028 is listed on the ITU&apos;s own editions page as SM.2028-0 (09/2012),</p>\n<p>In force, under the title &quot;Protection distance calculation between inductive systems and</p>\n<p>radiocommunication services using frequencies below 30 MHz&quot;. Inductive systems. Below 30 MHz.</p>\n<p>A ground-wave propagation model is the right tool there and the wrong tool for a microwave</p>\n<p>beam arriving from orbit at a steep elevation angle.</p>\n<p>Recommendation ITU-R RA.769 is more pointed. The in-force edition is RA.769-2 (05/2003),</p>\n<p>listed by the ITU as incorporated by reference in the Radio Regulations, which gives its</p>\n<p>tables real regulatory weight. Section 2 of its Annex 1 opens by saying that the threshold</p>\n<p>levels in Tables 1 and 2 &quot;are applicable to terrestrial sources of interfering signals&quot;. It</p>\n<p>then handles geostationary satellites as a special case, and recommends that for</p>\n<p>transmitters in the geostationary orbit the tabulated levels be adjusted by a further</p>\n<p>15 dB, because a telescope pointed within about five degrees of such a transmitter sees it</p>\n<p>through a much higher side lobe.</p>\n<p>RA.769-2 also anticipated the problem in 2003. Among its considerings is the observation</p>\n<p>that &quot;some transmissions from spacecraft can introduce problems of interference to radio</p>\n<p>astronomy and that these cannot be avoided by choice of site&quot;. Siting is the entire</p>\n<p>mitigation available for terrestrial wireless power. It is the one mitigation that does not</p>\n<p>work against a satellite.</p>\n<h2 id=\"the-missing-number-is-about-181-db-and-that-is-an-estimate\">The missing number is about 181 dB, and that is an estimate</h2>\n<p>Here is the arithmetic, labelled as an estimate because it is mine, derived from two</p>\n<p>documented figures rather than taken from any study.</p>\n<p>Table 1 of RA.769-2 gives, for continuum observations centred on 4 995 MHz over a 10 MHz</p>\n<p>bandwidth, a detrimental threshold power flux density of −171 dB(W/m²). That is the 4 990 to</p>\n<p>5 000 MHz radio astronomy band, and it is the nearest protected continuum entry in the table</p>\n<p>to the band space solar power concepts most often name. The same table gives −201 dB(W/m²)</p>\n<p>at 13.385 MHz and −199 dB(W/m²) at 25.610 MHz, which are the low-frequency bands CRAF is</p>\n<p>worried about. Both figures assume a 2 000 s integration, a 0 dBi side lobe, and a single</p>\n<p>antenna.</p>\n<p>Take an upper bound on what a ground spot would be allowed to carry. ICNIRP&apos;s 2020</p>\n<p>radiofrequency guidelines set a whole-body reference level of 10 W/m² above 2 GHz, and</p>\n<p>IEEE C95.1-2019 is the companion standard a United States site would be assessed against.</p>\n<p>A beam constrained to 10 W/m² at the spot sits about 181 dB above the RA.769 threshold for</p>\n<p>the adjacent protected band. Apply RA.769&apos;s own 15 dB geostationary adjustment and the</p>\n<p>figure is about 196 dB.</p>\n<p>That is not a claim that a beam would cause 181 dB of interference. The beam is not in the</p>\n<p>radio astronomy band, so what the number describes is the out-of-band suppression, in the</p>\n<p>telescope&apos;s side lobes, that a space-to-Earth system would have to demonstrate in a</p>\n<p>neighbouring protected allocation. It is a rough upper bound and it ignores the bandwidth</p>\n<p>conversion between the table&apos;s 10 MHz reference and a real spurious emission mask. The</p>\n<p>reason to state it anyway is that nothing in the literature this project can reach states</p>\n<p>anything at all, and 181 dB is a different order of engineering problem from the 5 km</p>\n<p>exclusion zone CRAF has costed. Note also that 5.8 GHz, the band most frequently discussed</p>\n<p>for this, is not regulatorily available for space-to-Earth power transmission; there is no</p>\n<p>allocation and the ITU&apos;s own Report SM.2392-2 (06/2026) is a report, which recommends</p>\n<p>nothing and binds nothing.</p>\n<h2 id=\"the-regulator-has-already-set-a-limit-above-what-its-own-stu\">The regulator has already set a limit above what its own studies asked for</h2>\n<p>The terrestrial precedent is worth reading closely, because it is the one that will be</p>\n<p>reached for.</p>\n<p>ECC Recommendation (25)01, &quot;Emission limit requirements for Wireless Power Transmission</p>\n<p>(WPT)&quot;, approved 14 February 2025, sets in its Table 4 an unwanted emission limit in the</p>\n<p>spurious domain of −20 dBµA/m per 10 kHz at 10 m across 5 to 30 MHz, for non-beam generic</p>\n<p>WPT. That is the figure CRAF cites, and reading the recommendation first-party confirms it.</p>\n<p>Two other lines in the same document matter more. Its considering k) records &quot;some study</p>\n<p>results in ECC Report 333 found limits to protect certain radio communication services that</p>\n<p>are lower than those in this Recommendation&quot;. The regulator knew the studies asked for</p>\n<p>tighter limits and set looser ones. And its recommends 6 states &quot;that WPT applications</p>\n<p>permitted under this ECC Recommendation operate on a non-interference, non-protected basis&quot;.</p>\n<p>For an operator that is the sentence to notice. Non-interference, non-protected means the</p>\n<p>wireless power system carries the whole risk: it must not interfere, and it has no claim if</p>\n<p>something interferes with it. If that framing is inherited by beamed systems, a ground</p>\n<p>receiving site near a protected passive allocation is not a planning risk that can be bought</p>\n<p>off. It is an unbounded liability with no standing.</p>\n<h2 id=\"what-this-changes-for-a-ground-site\">What this changes for a ground site</h2>\n<p>Nothing yet, and that is the honest answer. No edition in this project&apos;s registry moved this</p>\n<p>week. But it adds a column to the question of where a receiving site can go, and the column</p>\n<p>is not one that appears in a land search. Distance to a radio astronomy facility is</p>\n<p>currently nobody&apos;s site-selection criterion for beamed power. On the terrestrial evidence it</p>\n<p>is already worth five kilometres for a thirty-watt charger, enforced through a device</p>\n<p>standard rather than a licence, and the only body that has written the satellite case down</p>\n<p>has written it down as a concern rather than a calculation.</p>\n<p>The useful posture is to treat the distance as unknown and to say so, rather than to assume</p>\n<p>that an allocation at 5.8 GHz would make the adjacent 4 990 to 5 000 MHz band somebody</p>\n<p>else&apos;s problem.</p>\n<h2 id=\"what-would-change-my-mind\">What would change my mind</h2>\n<p>A published compatibility study for beamed space-to-Earth power against RA.769, by anyone,</p>\n<p>using a propagation model valid above 30 MHz. If that study comes back with a required</p>\n<p>suppression well below the 181 dB estimated here, because a real spurious mask and a real</p>\n<p>antenna pattern are far better than an upper bound on main-beam density implies, then the</p>\n<p>framing above is alarmist and the correct answer is that filtering solves it.</p>\n<p>Equally, a first-party ITU-R work item that takes the space case under an existing agenda</p>\n<p>item would change the shape of this. CRAF&apos;s article routes the question to WRC-31</p>\n<p>preliminary agenda item 2.2 under Resolution 910 (WRC-23), which this project has already</p>\n<p>examined. If instead a WRC-27 item absorbed it, the timeline moves forward by four years and</p>\n<p>the argument that nobody is working on it fails.</p>\n<p>One limitation is stated rather than hidden. The Addendum to ECC Report 333 itself was not</p>\n<p>read for this article: docdb.cept.org failed TLS certificate verification on every attempt</p>\n<p>from this run, so the Addendum&apos;s scope, its five-kilometre result and its ECC Report 289</p>\n<p>companion for electric vehicle charging are reported as the CRAF newsletter states them, and</p>\n<p>have not been independently verified against CEPT&apos;s own text. ECC Recommendation (25)01 was</p>\n<p>read first-party, through a different host, in its 14 February 2025 edition; a later amended</p>\n<p>edition is indexed and was not reachable.</p>\n<h2 id=\"sources\">Sources</h2>\n<ul>\n<li><a href=\"https://www.craf.eu/newsletter/\" rel=\"noreferrer noopener\">https://www.craf.eu/newsletter/</a></li>\n<li><a href=\"https://www.craf.eu/wp-content/uploads/2026/09/CRAF_Newsletter-37.pdf\" rel=\"noreferrer noopener\">https://www.craf.eu/wp-content/uploads/2026/09/CRAF_Newsletter-37.pdf</a></li>\n<li><a href=\"https://www.itu.int/rec/R-REC-RA.769/en\" rel=\"noreferrer noopener\">https://www.itu.int/rec/R-REC-RA.769/en</a></li>\n<li><a href=\"https://www.itu.int/dms_pubrec/itu-r/rec/ra/R-REC-RA.769-2-200305-I!!PDF-E.pdf\" rel=\"noreferrer noopener\">https://www.itu.int/dms_pubrec/itu-r/rec/ra/R-REC-RA.769-2-200305-I!!PDF-E.pdf</a></li>\n<li><a href=\"https://www.itu.int/rec/R-REC-SM.2028/en\" rel=\"noreferrer noopener\">https://www.itu.int/rec/R-REC-SM.2028/en</a></li>\n<li><a href=\"https://cept.org/documents/srdmg/88799/info-94_05_ecc-recommendation-25-01-published-on-14-02-2025\" rel=\"noreferrer noopener\">https://cept.org/documents/srdmg/88799/info-94_05_ecc-recommendation-25-01-published-on-14-02-2025</a></li>\n<li><a href=\"https://docdb.cept.org/document/26186\" rel=\"noreferrer noopener\">https://docdb.cept.org/document/26186</a></li>\n<li><a href=\"https://www.astron.nl/telescopes/lofar/\" rel=\"noreferrer noopener\">https://www.astron.nl/telescopes/lofar/</a></li>\n<li><a href=\"https://www.icnirp.org/cms/upload/publications/ICNIRPrfgdl2020.pdf\" rel=\"noreferrer noopener\">https://www.icnirp.org/cms/upload/publications/ICNIRPrfgdl2020.pdf</a></li>\n<li><a href=\"https://standards.ieee.org/ieee/C95.1/4940/\" rel=\"noreferrer noopener\">https://standards.ieee.org/ieee/C95.1/4940/</a></li>\n<li><a href=\"https://www.itu.int/pub/R-REP-SM.2392\" rel=\"noreferrer noopener\">https://www.itu.int/pub/R-REP-SM.2392</a></li>\n</ul>"
}